Construction Setting Out

We transfer approved design geometry and levels onto the ground so the site team can build from the required position and elevation.

Service overview

Put the approved design onto the site

We work from the supplied approved design and project control to set out the points, lines, levels and geometry required for construction.

The setting-out scope is organised around the construction stage so the site team receives the information needed when the work is ready to build.

Approved geometrySetting-out information derived from the supplied approved project design.
Points, lines & levelsConstruction positions, alignments and levels transferred onto the site.
Stage recordsSetting-out and checking information retained around the commissioned work.
Construction Setting Out example
Applications

Where this is used

Common applications within construction, earthworks, development and survey workflows.

Foundations & structures

Foundations & structures

Gridlines, corners, pile positions and structural references.

Roads & kerbs

Roads & kerbs

Alignments, levels, channels and external-work geometry.

Drainage

Drainage

Manholes, pipelines, chambers and invert/level references.

Earthworks & platforms

Earthworks & platforms

Formation, slope, platform and selected level references.

Construction Setting Out deliverable example
Deliverables

What you receive

Site set-out marksPhysical references appropriate to the construction task.
Coordinate / level schedulesPrepared setting-out data where required.
CAD setting-out informationWorking geometry extracted from approved design data.
Survey recordsCheck observations or setting-out records to agreed scope.
Workflow

How we deliver it

We plan the sequence around the project brief, programme and required deliverables.

01

Confirm design revision

Use the approved project drawing/model and current setting-out information.

02

Check control

Confirm the project coordinate and level framework.

03

Prepare geometry

Calculate the coordinates, levels, offsets and references required.

04

Set out

Mark the instructed construction geometry on site.

05

Check

Carry out suitable independent observations and close-out checks.

06

Record

Issue coordinates, sketches or survey records where required.

Construction Setting Out project example
Questions

Construction Setting Out FAQ

What can be set out on a construction project?

Typical work includes gridlines, foundations, roads, kerbs, drainage, manholes, structures, levels, platforms and other approved geometry within the instructed scope.

What information is needed before setting out?

Current approved design information, project control, coordinate/level data and clear identification of the elements or construction stage to be set out.

Project enquiry

Tell us what you need for Construction Setting Out.

Send the site location, drawings, specification or a short description of the work. We’ll review what needs surveying and the project information your team needs back.