Construction & Site Engineering · Essex · London · South East

Construction Setting Out

Approved design geometry transferred accurately to site.

Service overview

Setting-out services

Construction setting out transfers approved design information to the physical site using the project control framework.

Typical work includes positions, levels, alignments, offsets and reference marks for groundworks, roads, drainage, structures and external works.

Coordinates & positionsSet out approved geometry from the current design information.
Levels & gradientsTransfer required construction levels and reference elevations.
Checks & recordsProvide appropriate check observations and site records for the instructed work.
Construction Setting Out example
Typical applications

Where this service is used

Common applications within construction, earthworks, development and survey workflows.

Foundations & structures

Foundations & structures

Gridlines, corners, pile positions and structural references.

Roads & kerbs

Roads & kerbs

Alignments, levels, channels and external-work geometry.

Drainage

Drainage

Manholes, pipelines, chambers and invert/level references.

Earthworks & platforms

Earthworks & platforms

Formation, slope, platform and selected level references.

Construction Setting Out deliverable example
Deliverables

Typical outputs

Site set-out marksPhysical references appropriate to the construction task.
Coordinate / level schedulesPrepared setting-out data where required.
CAD setting-out informationWorking geometry extracted from approved design data.
Survey recordsCheck observations or setting-out records to agreed scope.
Workflow

Typical project workflow

The exact sequence is adjusted to the project brief, programme and required deliverables.

01

Confirm design revision

Use the approved project drawing/model and current setting-out information.

02

Check control

Confirm the project coordinate and level framework.

03

Prepare geometry

Calculate the coordinates, levels, offsets and references required.

04

Set out

Mark the instructed construction geometry on site.

05

Check

Carry out suitable independent observations and close-out checks.

06

Record

Issue coordinates, sketches or survey records where required.

Construction Setting Out project example
Questions

Construction Setting Out FAQ

What can be set out on a construction project?

Typical work includes gridlines, foundations, roads, kerbs, drainage, manholes, structures, levels, platforms and other approved geometry within the instructed scope.

What information is needed before setting out?

Current approved design information, project control, coordinate/level data and clear identification of the elements or construction stage to be set out.

Project enquiry

Discuss your construction setting out requirement.

Send the site location, drawings, specification or a short description of the work required.